TM 11-5821-333-30
4-22. CHASSIS
This task covers: a. Removal
b. Installation
INITIAL SETUP
Tools
Tool Kit, Electronic Equipment, TK-105/G
REMOVAL
INSTALLATION
1.
2.
3.
4.
5.
Remove access cover (para 4-17).
1.
Remove FSK detector, data processor, bit
2.
sync, and power supply modules (para
4-18).
3.
Remove center shield (para 4-19).
4.
Remove connector housing (para 4-20).
5.
Remove backplane (para 4-21).
Install backplane (para 4-21).
install connector housing (para 4-20).
Install center shield (para 4-19).
Install FSK detector, data processor, bit sync,
and power supply modules (para 4-18).
Install access cover (para 4-17).
Section V. PREPARATION FOR STORAGE OR SHIPMENT
4-23. GENERAL INFORMATION
a. Pack the dra and modules in approved shipping containers.
b. All modules must be shipped enclosed in material that provides protection from static electricity. See the
following paragraph.
4-24. PACKING STATIC SENSITIVE MODULES
The following steps should be followed when packing a static sensitive module for storage or shipment.
CAUTION
To avoid damaging static sensitive modules, use an antistatic pad on the work surface and wear
a grounded wrist strap when handling the module.
ITEM
ACTION
a.
b.
c.
d.
Module (1)
Antistatic package
Antistatic package
Shipping container
a.
(4)
b.
(4)
c.
(6)
d.
Place inside antistatic bag (2) or inside antistatic
wrapping material (3). See figure 45.
Seal with adhesive tape. Attach sensitive elec-
tronic device unit pack label (5).
Place inside approved shipping container (6).
Attach sensitive electronic device intermedi-
ate pack label (7).
4-70
