TM 11-5821-333-30
6-31. TEST ADAPTER CONNECTORS. Continued
f. Replacement of Connectors P5 and P10
This task covers: a. Removal
b. Installation
INITIAL SETUP
Tools
Tool Kit, Electronic Equipment, TK-105/G
Pin removal/installation tool included with replacement connector
Equipment Conditions
Interconnecting device removed from chest (paragraph 6-22).
REMOVAL
1.
2.
3.
4.
5.
6.
Loosen screw locks securing connector (1)
to circuit card (2),
Disconnect connector (1) from circuit card
(2) .
Remove and retain two screw lock assem-
blies from connector.
Tag wires for reinstallation,
Using tool supplied with connector, remove
wires/pins from connector.
Remove connector,
INSTALLATION
1.
Using tool supplied with connector, install wi-
res/pins into connector.
2. Install two screw lock assemblies retained
from old connector,
3. Connect connector (1) to circuit card (2).
4. Tighten connector screw locks.
6-202