TM 11-5821-333-303-10. TROUBLESHOOTING FLOWCHARTS. ContinuedCHART 6Fails Self-Test with IFM-RF PWR Switch at HI, LO, or OFFNOTE1. SET TEST ADAPTER:DCOFF2. DISCONNECT TESTCABLE W3 FROM UUT.3. REMOVE CONTROLPANEL (A1) FROM UUT.4. USE DMM AND TESTLEADS TO MEASURE RE-SISTANCE BETWEENW1P2 AND IFM-RF PWRSWITCH (S1). SEETABLE.See figure FO-11 forlocation of test points.IFM-RF PWRMEASUREFAILUREBETWEENHIP2-9S1-4LOP2-8S1-2OFFP2-27S1-1W1 FLEX CABLE ASSEMBLYIS BAD.YESIFM-RF PWRMEASUREFAILUREMEASURE RESISTANCE BE-BETWEENTWEEN POINTS ON BACK-HIJ2-9XA3-24PLANE . SEE TABLE.LOJ2-8XA3-21OFFJ2-27XA3-44W1 FLEX CABLE ASSEMBLYIS BAD.3-47
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business