TM 11-6110-211-15
CHAPTER 4
DEPOT OVERHAUL STANDARDS
tion equivalent to that of new equipment.
4-1. Purpose of Final Testing
The tests outlined in this chapter are de-
4-2. Test Facilities Required
signed to measure the performance capa-
a. Test Equipment. The following equip-
b i l i t y of repaired equipment. Equipment
ment, or suitable equivalents, will be em-
that meets the minimum standards stated
ployed in determining compliance with the
in the tests will furnish satisfactory opera-
requirements of this manual:
Applicable
Qty
Federal
Equipment
literature
req`d
stock No.
1
6105-806-8614
1
5905-195-6806
1000 ohms, 5 percent,
1/2 watt.
TM 11-6625-320-12
2
ME-30B/U.
5950-042-6449
Step Down.
Resistor, Variable,
1000 ohms, 5 percent,
5 watts, 3600-degree
rotation.
1
TM 11-6625-525-12-1
6625-999-7465
*Phase Angle
AN/USM-223 (*)/U.
1
6625-913-9781
TM 11-6625-200-15
ME-26D/U.
*AM-3209/ASN
1
Test Panel.
TM 11-6625-366-15
1
6635-553-0142
TS-352B/U.
1
5935-192-4753
PL55 Phone Plug.
........................
1
ME-65/U, ME-65A/U,
or ME-156/U.
1
115.0 2.0 volts,
400 2 cycle,
single-phase source.
*Equipment
used
when
testing
with
AM-3209/ASN
test
panel.
Change 1 4-1